Evaluation of the Pre-Qualification Criteria and Use of Tender Document in the Award of Building Contracts in Federal Universities in North Central, Nigeria
Abstract
This study evaluates the implementation of pre-qualification criteria and the use of a tender document in the award of building contracts in Federal Universities in North Central, Nigeria. Two research questions and two null hypotheses guided the study. The study employed a descriptive survey research design. The population for the study was 71 respondents which consist of 17 bureau of public procurement staff and 54 procuring entities in Federal Universities in North Central. The instrument used for data collection was a 17 items questionnaire with a four-point rating scale and has response options of Adequately Implemented (AI), Implemented (I), Not Implemented (NI) and Highly Not Implemented (HNI). To ensure the validity of the instrument it was subjected to content validity by three subject matter experts after which their suggestions and corrections were reflected on the final copy of the instrument that was used for data collection. The reliability coefficient of the instrument was established to be 0.86 using the Cronbach Alpha formula. Data collected were analyzed using mean and standard deviation for answering research questions and t-test statistics for testing the null hypotheses at a 0.05 level of significance. Findings revealed that building contractors in the Universities are not adequately pre-qualified and contractors documents are not tendered as spelt out in PPA of 2007. Based on the findings, it is therefore recommended that contractors in the building industry should aspire to understand the essence of tendering document in the award of building contracts and thereafter ensure that their document meet the requirement of every building contract provision before tendering such document for building contract bidding in the University.
Full Text:
PDFReferences
African Development Bank (AFDB, 2012). African Development Bank Group Development Effectiveness Review 2012 , Printed in Tunisia.
Akinola J.A., Okolie K.C. and Akinola V.O. (2013). Evaluation of procurement methods for sustainable environmental development in Nigeria.Civil and Environmental Research, 3(3), 29-37.
Chinwokwu G. (2000). The role of professionals in averting building collapse: Causes, prevention and remediesNigeria Institute of Building, Lagos State Chapter.
Egenhofer M.J. and Mark D.M. (2002). Geographic information science: Second International Conference, GIScience 2002, boulder, CO, USA. September 25 -28, 2002: Proceedings Springer, 110. Retrieved March 21, 2017 from books.google.fr
Ekpenkhio, S.A (2003). “Public sector procurement reform: The Nigeria Experience†A paper presented to the Government of the Federation at the Regional Workshop on Public Procurement Reform and transparency in Government Procurement for Anglophone African countries in Tanzania.
Familoye, O., Ogunsemi, D.R., and Awodele, O.A. (2015).Assessment of the challenges facing the effective operations of the Nigeria Public Procurement Act 2007.International Journal of Economics, Commerce and Management, III(11), 957-968.
FAO. (2016). Procurement guidelines for tender preparation, evaluation and award of contract. Retrieved on 2 September, 2017 from http://www.fao.org
Federal Republic of Nigeria. (2007). Public Procurement Act 2007 official Gazette. Retrieved 1 September, 2017 from google.com
Fergus R. (2006). Round hall nutshells contract law. Dublin: Thomson Round Hall
Institute of Civil Engineers. (2007). What is civil engineering. Retrieved 28 August, 2017 from https://www.ice.org.uk
Jacob (2010). The Effect of Employment Protection on Worker Effort: Evidence from Public Schooling, NBER Working Paper No. 15655 Issued in February 2010.
Jiya, V.H. (2012). An appraisal of prequalification criteria used for contractors selection in public building projects in Nigeria. Retrieved on 21 September, 2017 from http://kubanni.abu.edu.ng.pdf
Knight, L. A., Harland, C. M., Telgen, J., Thai, K. V. & Callender, G. (2008), Public Procurement: International Cases and Commentary, Journal of Public Procurement, 8 (3), 303-322.
OECD-DAC/World Bank, (2005). Organization for Economic Committee Development/Development Assistance Committee (DAC)/ World Bank. Guidelines and Reference Series. A DAC Reference Document Harmonising Donor Practices for Effective Aid Delivery, Version 3: Strengthening Procurement Practices in Development.
Okafor, E.E. (2005). Public Bureaucracy and Development in Nigeria: A Critical Overview of Impediments to Public Service Delivery CODESRIA Bulletin, Nos. 3-4
Okoye U.P, Ezeokonkwo U.J. and Ezeokoli O.F. (2016). Building construction workers’ health and safety.Journal of Safety Engineering, 5(1): 17-26
Olatunji, O.A. (2007); Evaluating the efficiency of prequalification as an tool in comparatives equation in Construction Developing countries. Proceeding of 2007 Quantity Surveyors, international convention Kuala lumpur Malaysia. pp 132-141.
Safeopedia Inc. (2017). Contractor prequalification. Retrieved on 22 September, 2017 from https://www.safeopedia.com
Tom P. (2011). What is Prequalification? Retrieved on 21 September, 2011 from https://www.kaieteurnewsonline.com