Effect of Building Delay on Construction Project Delivery in Minna, Nigeria
Abstract
Delays in construction projects are highly expensive and often lead to disputes and claims. Therefore, monitoring project progress is crucial to prevent delays or detect them early. This study investigated the impact of building delays on construction project delivery in Minna, aiming to minimize future delays. Data were gathered from construction professionals, with 184 questionnaires distributed and 156 returned, yielding an 85% response rate. The data were analyzed using percentages and mean item scores (MIS). The study identified ten key causes of delays in building construction, with the most significant being a lack of funds (MIS = 4.85), inaccurate material estimates (MIS = 4.76), and insufficient worker motivation (MIS = 4.56). Overall, all causes were deemed significant (average MIS = 3.91). It also highlighted eight effects of building delays, with time overruns (MIS = 4.85) and increased project costs (MIS = 4.61) being the most severe, while project abandonment was the least significant (MIS = 2.80). On average, all the effects of delays were considered significant (average MIS = 3.69). The most effective strategies to minimize or eliminate delays included securing reliable funding and ensuring timely payments (MIS = 4.90), proper material procurement (MIS = 4.66), and strategic planning with systematic controls (MIS = 4.52). All strategies were found to be effective (average MIS = 3.76).Building delays have a significant impact on project delivery. To reduce delays and their effects, the study recommended thorough planning, ensuring adequate funding from project inception, and engaging competent professionals to manage the design and cost control throughout the project. The study also identified eight major effects of building delays, with time overruns (MIS = 4.85) and cost increases (MIS = 4.61) being the most notable. Abandonment of projects (MIS = 2.80) was the least significant effect. On average, the effects of delays were significant (average MIS = 3.69).To mitigate delays, the most effective strategies identified were securing reliable funding and timely payment of interim certificates (MIS = 4.90), proper material procurement (MIS = 4.66), and effective planning and control (MIS = 4.52). The average effectiveness of the strategies was rated at 3.76.The study concluded that delays significantly affect project delivery, and recommended that clients ensure proper planning, secure sufficient funding, and engage qualified professionals from the project's inception to minimize delays and their impacts.
Full Text:
PDFReferences
Abedi, M, Fathi, M. S., & Mohammad, M. F. (2011), Effects of Construction Delays on Construction Project Objectives: Proceeding of the 1st Iranian Student Scientific Conference in Malaysia, UPM, Malaysia 345-356.
Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry: International Journal of Project Management: 593 – 599,
Aibinu, A. A. & Odeyinka, H. A. (2006), Construction Delay and their Causative Factors in Nigeria: Journal of Construction Engineering & Management, ASCE, 132 (7), 667-677.
Akinsiku, O. E., & Akinsulire, A. (2012). Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery. Journal of Construction Engineering & Project Management, 2(4), 25-31.
Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). Analyzing delay causes & effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 198-214.
Ashraf, S. & Ghanim, A. (2016). Causes and Effects of Delay in Public Construction Projects
in Jordan. American Journal of Engineering Research (AJER), 5, 5, 87-94.
Ayudhya, B. I. N. (2011), Evaluation of Common Delay Causes of Construction Projects in Singapore: Journal of Civil Engineering & Architecture, 5, 11, 48, 1027-1034, USA.
Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business,
Fashina, A. A., Fakunle, F. F., & Opiti, C. (2020). Exploring the common delay factors related to major parties involved in construction projects: A systematic review. PM World Journal, 9, 5, 1-18.
Flick, U. (2022). An introduction to qualitative research. (7th ed.). London: Sage Publications Limited.
Frank, G. C. (2012). Construction Quality; Do it right or pay the price: Prentice hall, USA
Hamzah, N., Khoiry, M. A., Arshad, I., Badaruzzaman, W. H. W. and Tawil, N. M. (2012), Identification of the Causes of Construction Delay in Malaysia: World Academy of Science, Engineering and Technology, 72, 614 – 619.
Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013), Analysis of Non-Excusable Delay Factors Influencing Contractors' Performance in Lagos State, Nigeria: Journal of Construction in Developing Countries, 18, 1, 53–72.
Mahamid, I., Brul&, A., & Dmaidi, N. (2012), Causes of Delay in Road Construction Projects: Journal of Management in Engineering, 28 (3) 300 – 310.
Mehdi,. R., Riazi, S., & Lamari, F. (2013). Public sector project delay: The Malaysian perspective & the way forward. In Proceedings of the 19th CIB World Building Congress, Brisbane, Construction and Society. Queensl and University of Technology.
Mehdi., Riazi, S., Skitmore, M., & Cheung, Y. K. F. (2011). The use of supply chain management to reduce delays: Malaysian public sector construction projects: In Proceedings of the 6th Nordic Conference on Construction Economics & Organization in Society 2, 403-414.
Memon, A. H., Abdul Rahman, I., & Abdul Azis, A. A. (2011), Preliminary Study on Causitive Factors Leading to Construction Cost Overrun: International Journal of Sustainable Construction Engineering and Technology 57-71.
Motaleb, O. & Kishk, M. (2010), An Investigation into Causes & Effects of Construction Delays in UAE: Association of Researchers in Construction Management, 1149-1157.
Oladinrin, T. O., Ogunsemi, D. R., & Aje, I. O. (2012), Role of Construction Sector on Economic Growth Empirical Evidence of Nigeria: FUTY Journal of the Environment 2(4), 32-44.
Olusegun, A. E., & Michael, A. O. (2011), Abandonment of Construction Projects in Nigeria: Causes and Effects: Journal of Emerging Trends in Economics & Management Sciences, 2, 2, 142-145.
Oyewobi, L. O., Jimoh, R., Ganiyu, B. O., & Shittu, A. A. (2016). Analysis of causes & impact of variation order on educational building projects. Journal of Facilities Management, 14, 2, 139–164. https://doi.org/10.1108/JFM-01-2015-0001
Pinamang, P. A., AduGyamfi, T., Danso, H., & Ampofo Kwame, J. (2018). Schedule delay analysis of construction projects in Ghana: objectives, importance and effects. Civil and Environmental Research, 10, 25-30
Radosavljevic, M., & Bennett, J. (2012). Construction management strategies: a theory of construction management. John Wiley and Sons.
Rao, B. P., Shekar, S. C., Jaiswal, N., Jain, A., & Saxena, A. D. (2016). Delay Analysis of Construction Projects. Journal of Information Technology and Economic Development, 7(1), 15.
Santoso, D. S., & Soeng, S. (2016). Analyzing delays of road construction projects in Cambodia: Causes and effects. Journal of Management in Engineering, 32(6), https://doi.org/10.1061/(ASCE)ME.1943-5479.0000467.
Sunjka, B. P. & Jacob, U. (2013) Significant Causes and Effects of Project Delays in the Niger Delta Region, Nigeria: Proceedings of SAIIE25, 641-1-14, Stellenbosch, South Africa.
Turkar, P., & Apte, M. R. (2016). Delay causes and importance of corrective actions on them. International Research Journal of Engineering and Technology, 3, 6, 863-866
Yalini, R., & Alan, S. (2015). Study on identification of delay factors in construction project in Tamilnadu. International Journal of Science and Engineering Research, 3, 5, 3221-3224.
Zakaria, Z., Ismail, S., &Yusof, A. M. (2012). Cause and impact of dispute and delay the closing of final account in Malaysia construction industry. Journal of Southeast Asian Research, 2, 1, 38-47.
Refbacks
- There are currently no refbacks.